ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI EFEKTIVITAS WAKTU PROYEK DAN DAMPAKNYA TERHADAP EFEKTIVITAS BIAYA PROYEK KONSTRUKSI (STUDI KASUS: PT PAN PASIFIC NESIA SUBANG – JAWA BARAT)

Lailan Tawila Berampu

Abstract


The parameter of the success of a project can be seen through the effectivenes of time and cost and the quality produced.  Several previous studies showed that the factor causing the achievement of the effectivenes of time and cost is the labor, materials and equipment, but, in general, a project has problem with the time and cost due to the incident of work delays and cost increases. The same thing also happens to the construction project that becomes the case discussed in this study. In this project, the lengthening of project completion time occured because of work delay that time effectivenes could be achieved that the cost effectiveness was not achieved either. Tne problem discussed in this study was what factors that influenced the effectiveness of time and cost in a construction project. The samples for this study were all of the project activities which belonged to the critical paths or condition. The data obtained were analyzed through Critical Path Method (CPM) and Path Analysis. The result of this study showed that (1) simultaneously, labor, materials, and equipment had positive and significant influence on the effectiveness of time, (2) partially, labor had positive and significant influence on the effectiveness of time, (3) partially, materials had positive and significant influence on the effectiveness of time, (4) partially, equipment did not have significant influence on the effectiveness of time,  (5) simultaneously, labor, materials, equipment and effectiveness of time had positive and significant influence on the effectiveness of cost, (6) partially, labor did not have significant influence on the effectiveness of cost, (7) partially, materials did not have significant influence on the effectiveness of cost, (8) partially, equipment did not have significant influence on the effectiveness of cost, (9) simultaneously, the effectiveness of time had positive and significant influence on the effectiveness of cost, (10) the direct influence of labor was bigger than the indirect influence of labor, (11) the indirect influence of materials was bigger than the direct influence of equipment, and (12) the indirect influence of materials was bigger than the direct influence of equipment.


Keywords


Project Resources, Effectiveness of Project Time, Effectiveness of Project Cost

Full Text:

PDF

References


Adane, Berhanu.,T. Mesfin and Giorgis. 2012. Cost EfFective Condominium Construction Project in Addis Ababa. Addis Ababa: Addis Ababa University Departemen of Construction and Technologi Management

Ali, Chekah., Neda, Yeganli. and Siamak, Haji, Yakchali. 2011. Organizational

Approach behaviour factor in responding to project risks using system dynamics. International Conference on Construction and Project Management. 15 : 84 – 88

Ariany, Frederika. 2010. Analisis percepatan pelaksanaan dengan menambah jam kerja optimum pada proyek konstruksi. Jurnal Ilmiah Teknik Sipil. 14: 113-126

Assaf, A. Sadi and Al-Hejji, Sadiq. 2006. Causes of delay in large construction project. Elsevier Project Management Journal. 24: 349-357

Bakourus, Kelessidis, B. 2010. Dissemination of innovation and knowledge management techniques. Thessaloniki Technology Park. Report produced for the EC funded project.

Chidambaran, Ramanathan.,Narayanan, S.P. and Arazi, Idrus. 2012. Construction delays causing risks on time and cost a critical review. Australasian Journal Construction Economics and Building. 1: 37-57

Dov, Dvir and Thomas, Lechler. 2003. Plans are nothing: The impact of changes on project success. Elsevier Journal. 33: 1-15

Ec.europa.eu/europeaid/evaluation/methodology/examples/too_cef_res_en.pdf

Ervianto, Wulfram. 2004. Teori Aplikasi Manajemen Proyek Konstruksi. Andi; Yogyakarta

Evaluasi akselerasi pelaksanaan pembangunan proyek berdasar time schedulle kurva S. http:// eprints.uny.ac.id/9610/1

Goldratt, E. M. 1990. Theory of constraints .USA; North River Press

Graham, K. Rand. 2000. Critical chain: the theory of constraints applied to project management. International Journal of Project Management. 18: 173-177

Gray, F. Clifford and Larson,W., Erik. 2006. Manajemen Proyek Proses Manajerial. Terjemahan oleh Dwi Prabantini, 2007. Yogyakarta : Andi

H.M. Jogiyanto. 2004. Metodologi Penelitian Bisnis. Yogyakarta; BPFE

Haseb. M., Lu, Xinhai., Aneesa Bibi and Maloof, Ud Dyiran. 2011. Problem of project and effects of delays in the construction industry of pakistan. Australian Journal of Business and Management Research. 1: 41-50

Heizer, Jay dan Render, Barry. 2009. Manajemen Operasi. Jilid 1. Terjemahan oleh Chriswan Sungkono. 2009. Jakarta: Salemba Empat

Husen, Abrar. 2009. Manajemen Proyek Perencanaan, Penjadwalan dan Pengendalian Proyek. Yogyakarta; Andi

Ibironke, O.T., Oladinrin,O., Adeniyi and I.V. Eboreime. 2013. Analysis of non – excusable delay in lagos state nigeria. Journal of Construction in Developing Countries (In press).

Idrus, Muhammad. 2009. Metode Penelitian Ilmu Sosial. Edisi Kedua. Jakarta; Erlangga

Jacob, Bradbury. D., T. William and Jr., McClelland. 2001. Theory of constarints project management. USA ; The goldratt institute.

Josler, Cheryl and Burger, James. 2005 Project Management Methodology in Human Resource Management. Cupa HR Journal .56 : 25-30

Kala,C. Seal. 2010. A generalized PERTH/CPM implementation in a spreadsheet. Informs Transactions on Education. 2 : 16 - 26

Kaliba, C. Muya, M. and Mumba, K. 2009. Cost Escalation and Schedulle Delay in Road Construction Projects in Zambia. International Journal of Project Management. 27:522-531

Kikwasi, J.P. 2012. Causes and effects of delays and disruptions in construction projects in Tanzania. Australasian Journal of Construction Economics and Building. 2: 52-59

Kousliki, P.A. and Kartan, N. 2004. Impact of Construction Materials on Project Time and Cost in Kuwait. Journal of Construction and Architectural Management. 11:126-132

Milis, Koen; 2008. The triple constraint: A valid set of criteria to measure project success. Brusesel; Hub Hogeschool universiteit

Munns, A.K., and Bjeirmi, B. F. 1996. The role of project management in achieving project success. International journal of project management. 14: 81-87

Nurhayati. 2010. Manajemen Proyek. Yogyakarta; Graha Ilmu

Olawale Yadisa and Sun Ming. 2010. Cost and Time Control of Construction Project: Inhibiting Factors and Mitigating Measures in Practice. Construction Management and Economics. 5: 509 – 526

P.A. Koushki., K. Al Rashid and N. Kartam. 2005. Delays and cost increase in the construction of private residential. Routledge. 23: 285-294

Parker, S. K and Skitmore, R. M .2005. Project management turnover: Causes and effects on project performance. International Journal of Project Management. 23: 205-214

Pay, Siddesh, and Giridharan, S. Application of theory of constraints and critical chain method for project management in ultra mega power projects (UMPP). National institute of construction management and research (NICMAR)

Peter, Stelth and Guy Le Roy. 2009. Projects’ analysis through CPM (critical path method). School of Doctoral Studies (European Union) Journal. 1: 11-50

Ralph, L. Kliem and Haris, Anderson. 1997. Teambuilding styles and their impact on project management result. Project Management Journal. 27: 1-8

Ramabudu, M.S., and Vester, J.J.P. 2010. Factors contributing to cost overruns projects. Built environment conference, Durban South Africa.

S.Nemati, A., Yari, S. Shirafkan, and S. Bashirzadeh. 2011. Modelling effective indicators of construction projects using fuzzy TOPSIS Method. Iran; Khavaran Higher-education Institute

Santosa, Budi; 2009. Manajemen Proyek Konsep & Implementasi, Edisi Pertama. Cetakan Pertama. Yogyakarta; Graha Ilmu

Santoso, Singgih. 2011. Structural Equation Modeling (SEM) Konsep dan Aplikasi dengan Amos 18. Jakarta: PT Elex Media Komputindo.

Sarwono, Jonathan. 2012. Path Analysis Teori, Aplikasi, Prosedur Analisis untuk Riset Skripsi Tesis dan Disertasi (menggunakan SPSS). Jakarta; PT Elex Media Komputindo

Siddesh Pai dan S.Giridharan. Application of theory of constarints and critical chain method for project management in ultra mega power projects (UMPP). National institute of construction management and research (NICMAR)

Soeharto, Iman. 2001. Manajemen Proyek dari Konseptual Sampai Operasional. Jilid 1 dan jilid 2. Jakarta ; Erlangga

Stair, M. Ralph and Render, Barry; 1997. Quantitative Analysis for Management. United State of America; Prentice-Hall

Supriyanti.2012. http:// Supriyanti-yantea. Blogspot.com/2012/10 penelitian-expost-facto.html

Tanzana, Sara. 2012. Project management in pharmacheutical. International Journal of Pharmacheutical and Life Sciences. 1: 1-13

Tindiwensi, Alinaitwe Henry and Apolot Ruth. 2010. An investigation into the causes of delay and cost overrun in uganda’s public sector construction projects. Second International Conference on Advance in Engineering and Technologi. 305-312

Tryon, A., Charles. 1990. Modern Project Management. Oklahoma; Tryon and Associates

Wordpress.com/2011/02/17/

www.kamusbahasaindonesia.org

Yang, Min-Lan, and Tsai, Tsung Cieh. 2008. Enhancement of schedulling reliability in building project using theory of Constraint. Journal Of The Operation Research Society Japan. 51: 284-298




DOI: http://dx.doi.org/10.31289/jkbm.v1i1.1396

Refbacks

  • There are currently no refbacks.