Analisa Jaringan Kerja dengan Metode CPM pada Proyek Pembangunan Gedung Balai Diklat BPK RI Perwakilan Provinsi Sumatera Utara di Medan

Hermanto Hermanto(1*), Kamil Mustafa(2), Banjarnahor Banjarnahor(3),


(1) Universitas Medan Area
(2) Universitas Medan Area
(3) Universitas Medan Area
(*) Corresponding Author

Abstract


Research was conducted at the training center bulding projec RI BPK Representative in Medan, North Sumatera, where the purpose of this research is to create a complex framework of activities based on project completion time and human resources available for job creation building structures manager. The framewwork presented in the form of work flow diagram (Network Diagram). From the data obtainned by the completion of the project structure has been estimated tim required to finish the job thus structure with the critical path method (Critical Path Method – CPM). After the calculation of forward and backward calculation is obtained : fastest tim starting and completion activities, no later than beginning and completion of, the lenght of the interval delay /postponement of activities. With the CPM method, completion building structure mnagement training center of RI BPK representative of North Sumatera Province is known than the sum of time critical activities. These critical activities each time interval did not have to delay the implementation of activities. The activities that are on the critical path is the activity with the notation : A-C-E-F-I-L-MQ-U-V-W-X-Y-Z-AA-AC-AD gained 4+9+6+6+1+3+6+1+1+6+1+6+6+1+6+1 = 64 days.


Keywords


Network analysis, Critical Path Method

Full Text:

PDF1

References


Hirn N. Ajuha, Project management (Techniques in Planning and Controlling Construction Proj ect) . Jhon Willey & Sons, New Jersey, 1976.

Imam Soeharto, Manajemen Proyek (Dari Konseptual sampai Operasional). , Edisi kedua Jilid I, Penerbit erlangga, 1999.

Stoner, J, management, PHI, 1978.

Sudjana, Metode Statistika Edisi kelima, Penerbit Tarsita, Bandung, 1999.

Sutoyo, S, Drs. Studi Kelayakan Proyek : Konsep dan Teknik, Seri Manajemen, No. 66 LPPM, Jakarta.

Suwarsono, Analisis Lingkungan Bisnis Negara Berkembang, Tiara Wacana,Yogyakarta, 1993.




DOI: http://dx.doi.org/10.31289/jime.v2i2.2437

Article Metrics

Abstract view : 0 times
PDF1 - 0 times

Refbacks

  • There are currently no refbacks.


Program Studi Teknik Indusri, Fakultas Teknik, Universitas Medan Area
Universitas Medan Area, Jalan Kolam No. 1, Pasar V, Medan Estate, Sumatera Utara http://ojs.uma.ac.id/index.php/jimedan Email: jime@uma.ac.id
Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License