HIRADC ANALYSIS FOR ROLLING STOCK BODY LIFTING NGROMBO RAILWAY MAINTENANCE CENTER
DOI:
10.31289/jcebt.v7i2.10196Published:
2023-09-06Issue:
Vol. 8 No. 2 (2024): JCEBT SEPTEMBERKeywords:
Transportasi, Railway, Maintenance, Building, Safety Management SystemArticles
Downloads
How to Cite
Wawan Riyanta, Septian Aryatama, Muhammad Adib Kurniawan, Sunaryo and Yuwono Wiarco (2023) “HIRADC ANALYSIS FOR ROLLING STOCK BODY LIFTING NGROMBO RAILWAY MAINTENANCE CENTER”, JOURNAL OF CIVIL ENGINEERING BUILDING AND TRANSPORTATION, 8(2), pp. 282–286. doi: 10.31289/jcebt.v7i2.10196.