OPTIMASI PENJADWALAN PROYEK MENGGUNAKAN METODE CPM
Studi Kasus: Pembangunan Jalan Sungai Manggis, Kecamatan Sambutan, Samarinda
DOI:
10.31289/jcebt.v7i2.10311Published:
2023-09-06Issue:
Vol. 8 No. 2 (2024): JCEBT SEPTEMBERKeywords:
Penjadwalan proyek, Critical Path Method (CPM), analisisArticles
Downloads
How to Cite
Ivan Dwi Ramadhani, Isnaini Zulkarnain, Adde Currie Siregar and Dheka Shara Pratiwi (2023) “OPTIMASI PENJADWALAN PROYEK MENGGUNAKAN METODE CPM: Studi Kasus: Pembangunan Jalan Sungai Manggis, Kecamatan Sambutan, Samarinda”, JOURNAL OF CIVIL ENGINEERING BUILDING AND TRANSPORTATION, 8(2), pp. 295–300. doi: 10.31289/jcebt.v7i2.10311.