EVALUATION OF PROJECT IMPLEMENTATION TIME BASED ON OPTIMISTIC, PESSIMISTIC, AND MOST LIKELY TIME USING THE MONTE CARLO METHOD
Project Case Study: Sentul Road Rehabilitation - Bendung Terrace - Tirtayasa, Serang District FY. 2022
DOI:
10.31289/jcebt.v7i2.10346Published:
2023-09-06Issue:
Vol. 8 No. 2 (2024): JCEBT SEPTEMBERKeywords:
Execution time, Optimistic time, Pessimistic time, Most likely time, Monte CarloArticles
Downloads
How to Cite
Muhammad Ridho Alcaesar, Eri Susanto Hariyadi and Mardiaman (2023) “EVALUATION OF PROJECT IMPLEMENTATION TIME BASED ON OPTIMISTIC, PESSIMISTIC, AND MOST LIKELY TIME USING THE MONTE CARLO METHOD: Project Case Study: Sentul Road Rehabilitation - Bendung Terrace - Tirtayasa, Serang District FY. 2022”, JOURNAL OF CIVIL ENGINEERING BUILDING AND TRANSPORTATION, 8(2), pp. 287–294. doi: 10.31289/jcebt.v7i2.10346.