Pengaruh Faktor Resiko Terhadap Keterlambatan Penyelesaian Proyek Pembuatan 3 Unit Pergola Makam Sunan Drajat Lamongan


tri sutrisno(1*),


(1) universitas islam lamongan
(*) Corresponding Author

Abstract


ABSTRACT

Service providers involved in a project generally expect the project to be carried out to run smoothly, the evaluation of risk factors for project delay is necessary. This study departs from the formulation of the problem are How to rank (factors) the factors that influence the delay in the completion of the construction work project making 3 units of pergola (Tomb of SunanDrajat). And this study aims to determine the risk factors affect the delay in completion of the project of making 3 units of pergola (Tomb SunanDrajat). The method of study is quantitative research by using field observation research methods and also data collection using people who are experts on the project. The data collected is based on the answers from respondents distributed to 20 respondents taken at random. The data analysis in this study using the Validity and Reliability Test using SPSS 22 is valid and relable and then the data were analyzed using the F test and T test. The results showed an F test of 9,337 and a t-test (2,661) for financial risk variables ( X1), tcount (2.258) for resource risk variables (X2) and tcount (3.132) for design risk variables (X3).


Keywords


Keywords: Risk factors, delays, projects

Full Text:

PDF

References


Agritama. (2018). Faktor-Faktor Yang Mempengaruhi Keterlambatan Proyek Konstruksi Di Surabaya . Jurnal Teknik Sipil.

Agustapraja, H. R., & Rosidah, S. A. (2020). Faktor Penentuan Lokasi Perumahan Dengan Metode Ahp Di Kabupaten Lamongan. Jurnal Teknik Sipil dan Teknologi Konstruksi, 6(1), 76-86.

Andries. (2017). Analisis Risiko Faktor-faktor Non Exsuable Pada Tahap Pelaksanaan Proyek Pembangunan Perumahan Di Kota Manado . Jurnal Teknik Sipil.

Dalimunthe. (2015). Identifikasi Faktor-Faktor Resiko Yang Mempengaruhi Keterlambatan Pelaksanaan Pekerjaan Pada Proyek Pembangunan Gedung Di Kota Medan. Jurnal Teknik Sipil.

Ervianto, W. I. (2002). Manajemen Proyek Konstruksi. Yogyakarta: Penerbit Andi.

Riduwan. (2015). Dasar-Dasar Statistika, Bandung: Alfabeta.

Smith dan Bohn. (March-April 1999). Small to Medium Contractor Contingency and Assumption of Risk. Journal of Construction Engineering and Management,.

Sugiyono. 2012. Metode Penelitian Kuantitatif Kualitatif dan R&D. Bandung:

Alfabeta.




DOI: https://doi.org/10.31289/jcebt.v4i2.4211

Article Metrics

Abstract view : 0 times
PDF - 0 times

Refbacks

  • There are currently no refbacks.


Program Studi Teknik Sipil, Fakultas Teknik, Universitas Medan Area
Universitas Medan Area, Jalan Kolam No. 1, Pasar V, Medan Estate, Sumatera Utara http://ojs.uma.ac.id/index.php/jcebt dan Email: jcebt@uma.ac.id
Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License