Skip to main content
Skip to main navigation menu
Skip to site footer
Open Menu
JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING
Current
Archives
Announcements
Statistik Pengunjung
About
About the Journal
Publication Ethics
Submissions
Editorial Team
Privacy Statement
Contact
Search
Register
Login
Home
/
Archives
/
Vol. 1 No. 2 (2017): EDISI NOVEMBER
Vol. 1 No. 2 (2017): EDISI NOVEMBER
Published:
Apr 26, 2019
ISSUE DOI:
10.31289/jime.v1i2
Articles
Penjadwalan Perkuliahan Dengan Metode Vertex Graph Coloring Dan Simulated Annealing
Author(s):
Anggi Natanael Silitonga
,
Dicky Apdillah
56-63
DOI:
10.31289/jime.v1i2.2328
121
310
PDF1
Analisa Tingkat Kebisingan terhadap Karyawan di Lingkungan Kerja Kantor PT. Surveyor Indonesia Cabang Medan
Author(s):
Muhammad Fahmi Sahab
,
Muhammad Banjarnahor
,
Chalis Fajri Hasibuan
64-70
DOI:
10.31289/jime.v1i2.2330
154
526
PDF1
Perencanaan Kapasitas Produksi Crude Palm Oil Menggunakan Metode Rough Cut Capacity Planning (RCCP) Di PT. PP Londonsumatra Indonesia Tbk, Turangie Palm Oil Mill
Author(s):
haniza haniza
71-78
DOI:
10.31289/jime.v1i2.2324
192
408
PDF1
Hubungan Motivasi dengan Produktivitas Karyawan di PT. Srikandi Inti Lestari
Author(s):
Yudi Daeng Polewangi
,
Budi Utomo
79-87
DOI:
10.31289/jime.v1i2.2334
76
96
PDF1
Penerapan Metode Peramalan Produksi dan Perencanaan Kebutuhan Bahan Baku Dengan Metode Material Requirement Planning di PT.CJ Feed Medan
Author(s):
Yufri Alrahman
,
Kamil Mustafa
,
Yuana Delvika
88-96
DOI:
10.31289/jime.v1i2.2335
570
2210
PDF1
Developed By
Open Journal Systems
Information
For Readers
For Authors
For Librarians